On Monday, August 14, a construction crew moved into the stretch of Bear Creek Trail between Kipling Parkway and Kipling Street and closed it. If you walk a dog, run, or ride this loop on any kind of schedule, you already know. What you might not know is that this closure is the last piece of a project that has been years in the making, that it already won two statewide honors before a single detour sign went up this month, and that it happens to land during the same six weeks Belmar's calendar is more loaded than it has been all year. That overlap is the story worth paying attention to, not the orange cones.
A trail that's been earning its upgrades
Bear Creek Trail runs through the Bear Creek Greenbelt on its way into Bear Creek Lake Park, the city's 2,624-acre park that draws more than half a million visits a year for hiking, fishing, boating, mountain biking and windsurfing. The trail itself has been undergoing a phased overhaul: roughly 12,000 linear feet of new soft-surface path running alongside the existing concrete, sections of that concrete widened to ten feet where the terrain allows, and blind curves softened to extend sightlines for the runners, cyclists and dog walkers who all share the same narrow strip of pavement.
This isn't cosmetic patchwork. The project was one of 14 selected statewide for a 2025 Colorado Lottery Starburst Award and also won that year's People's Choice Award, recognition that reflects how much use this corridor actually gets relative to its size. Earlier this year, work on an earlier phase stopped entirely when a pair of owls nested near the west end of the construction zone. Federal law protects active raptor nests, so the city held off until the owls confirmed they'd moved on in mid-May before crews could remobilize. That's the kind of detail that tells you this project has been managed carefully rather than rushed, which matters if you're the one rerouting your evening walk around it for the next month and a half.
The current phase, from Kipling Parkway to Kipling Street, is expected to take about six weeks, weather permitting, which puts a realistic reopening somewhere in late September. Detours are marked on site. If you've been circling the lake on autopilot for years, this is the stretch where that habit gets interrupted whether you plan for it or not.
Two calendars, the same six weeks
Here's the part that actually changes how you might think about this closure. The same window that takes the easy lake loop off the table is the window Belmar has stacked with more going on than usual.
| Date | What's happening |
|---|---|
| August 14 | Bear Creek Trail's final construction phase begins, Kipling Parkway to Kipling Street |
| August 22 | Colorado Ukrainian Festival at Heritage Lakewood |
| September 12 | Belmar Fitness Expo on the plaza |
| September 19 | Barktember Fest, including the Wiener Dog Race, at Belmar |
| Late September | Bear Creek Trail's final phase expected to wrap, weather dependent |
Belmar spans 22 square city blocks of restaurants, galleries, a movie theater and a bowling alley, all centered on a plaza that was built for exactly this kind of foot traffic. If your usual routine has been lake loop first, errands later, the trail closure is a reasonable excuse to flip that order for six weeks and let Belmar absorb some of the walking, the dog time and the evening plans you'd normally spend on the water.
What's actually worth trying while you're down there
The plaza's restaurant lineup has filled in enough that this isn't a stretch. Depending on what you're after on a given night, Belmar currently has:
- Birdcall, for a quick weeknight dinner
- GQue BBQ
- Great Divide Brewing Company & Roadhouse, pairing the brewery's beer with a full kitchen
- Tstreet, known locally for its Teller Burger alongside more upscale plates like P.E.I. mussels
- Little India Restaurant & Bar
- Mason's Dumplings
- P.F. Chang's, which stays open into the evening on event nights
- Lady Nomada, listed as coming soon
If you're hosting someone from out of town and want a night that feels like an occasion rather than a weeknight stop, Simms Steakhouse on West 6th Avenue is a different kind of destination entirely, perched in the foothills with a skyline view that does a lot of the work for you.
None of this is new information if you already shop at Belmar regularly. What's worth noticing is the density. A few years ago, filling an evening at the plaza meant picking from a shorter list. Now there's enough on Wilcox and Upham that swapping a lake walk for a plaza walk doesn't feel like a downgrade.
Rerouting on purpose instead of by accident
The easy read on all this is that Bear Creek Trail is closed and Belmar has some events, two unrelated facts that happen to share a summer. The more useful read is that Lakewood residents get a natural six-week test of an alternate routine, and the plaza has quietly built up enough dining and programming to make that test worth running. The Colorado Ukrainian Festival at Heritage Lakewood on August 22 gives you a reason to be in that part of town this week. The Fitness Expo on September 12 and the Wiener Dog Race on September 19 give you two more reasons before the trail even reopens. String those together and you've replaced a habit, not just detoured around a construction zone.
Trail projects like this one tend to fade into the background once they're done. The widened concrete and the new soft-surface path will just be how Bear Creek Trail is, and most people won't remember exactly when it changed. But the six weeks in between are a real shift in how this part of Lakewood moves, eats and spends a Saturday, and it's worth using them on purpose rather than waiting them out.
If the way you use this stretch of Lakewood ever turns into a bigger conversation about your next move here, whether that's a first home near Belmar or a step up somewhere closer to the trail, Keely Hawk has spent more than two decades tracking these Denver-metro submarkets block by block. Request Your Free Home Valuation or Private Listing Access whenever you're ready to talk it through.